<$BlogRSDUrl$>

Tuesday, March 04, 2008

RENO

Big day today.

The refrigerator is where the desk used to be and the desk is sort of pulled apart awaiting a reformation in the old refrigerator space.

It hasn't been heavy lifting for me.

I went for a nap and when I got up it was all done.

The afternoon was excruciating to watch but a snap for Angel, our contractor, who threaded the copper tubing (3/8") over the ceiling, through the maze of overhead lights from the water line to the new refrigerator location.

He is enormously patient. Focused. There is no waste motion.

A good day.

I had all the shit on my desk covered in a black sheet to protect it. Color coordinated.

Labels:


Comments: Post a Comment

This page is powered by Blogger. Isn't yours?