Tuesday, March 04, 2008
RENO
Big day today.
The refrigerator is where the desk used to be and the desk is sort of pulled apart awaiting a reformation in the old refrigerator space.
It hasn't been heavy lifting for me.
I went for a nap and when I got up it was all done.
The afternoon was excruciating to watch but a snap for Angel, our contractor, who threaded the copper tubing (3/8") over the ceiling, through the maze of overhead lights from the water line to the new refrigerator location.
He is enormously patient. Focused. There is no waste motion.
A good day.
I had all the shit on my desk covered in a black sheet to protect it. Color coordinated.
Labels: rehab
Comments:
Post a Comment