Yesterday was the day of the concrete pour. We got the new cap on the new pool.

The prep is incredibly detailed. First, the forms; which are custom built from styrofoam elements. These are wired to the interior deck every foot to hold the weight of the mass.

The tile which has been installed is covered with a stick-on shield. We have curves which are a challenge. There are slot drains all around, so the drainage for that needs to be put in place.

The concrete gets ordered the morning of. Out here, there is a cement shortage (China); so, it is not always a sure thing. The folks out through the pass had a rainy day, so the demand was low; colored concrete due at 2PM.

Well, it showed up at three. And, here is the part I was not ready for. Once it is poured (through a hose, the mixer radio controlled, operator fills forms) the guys had to level, then trowel, then shape and brush as the concrete hardened. It took them until 10PM. They do this all the time. We do not. They have floods of course. They do not do it in the dark or rely on our patio lights.

Today, it looks great. We are a little touch and go with the color; it is still wet and dark. The desired dark tan is already showing here and there on the drier parts. It will be OK.

Very messy process; as organized and careful the guys were. At 8AM this morning they were back to clean up and they have done a great job. The back yard is cleaner than it has been since this project started! A real treat.

Franklin is in heaven. He has been housebound during the pouring. No puppy prints allowed. Cabin fever is over. He has been out running around in the yard all afternoon. And, he is still waiting for the water to return. We assure him that day is coming sooner now, rather than later.