<$BlogRSDUrl$>

Tuesday, April 01, 2008

INSTALL AND DELIVER

The two refrigerators came today.

I am exhausted from all the emptying and filling back up.

The big one in the kitchen has made its first ice cubes. We have to throw the first three loads away as it cleans out the line.

Everything fit back in both with more space left over.

They are pretty neat.

But when you come right down to it, a refrigerator is a refrigerator.

The big one has a bit more brain than the old one. It remembers glass volumes on the water spout and will fill to suit.

There is some control shit which looks like it doesn't mean too much inside. Door temperature.

Basically, the two machines are new.

At the same time, on the same day, we are getting the tankless water heater installed.

So far it is going pretty well.

Angel says that the old tank is about a quarter or a third full of calcium carbonate. No wonder we seemed to be running out of volume.

OK.

Nice timing.

It is over.

Well, if the new one works it is over. Our backup is to set up the old one with hoses until a new part or whatever is aquired. I hope we do not need Plan B.

Labels: ,


Comments: Post a Comment

This page is powered by Blogger. Isn't yours?